Concrete Calculator
Calculate concrete volume for slabs, walls, columns, footings & more
Measurement Unit
Select Shape
Dimensions
💡
💡
Quantity & Waste
💡e.g. 4 columns, 6 footings
💡Typically 5–15%
📐 Quick Conversions
Select a shape and enter dimensions to calculate
Results will appear here
Calculating…
Total Concrete Volume
ft³ / yd³
Est. Weight
@ 2,400 kg/m³
Premix Bags Needed
25 kg bags
≈ 0.011 m³ each
40 kg bags
≈ 0.017 m³ each
60 lb bags
≈ 0.45 ft³ each
80 lb bags
≈ 0.60 ft³ each
* Bag counts are rounded up. Actual yield may vary slightly by brand.
Volume Breakdown
What-If: Volume by Quantity
All volumes are calculated in the selected unit system then converted. Concrete density assumed at 2,400 kg/m³ (150 lb/ft³) for weight estimate.
Volume formulas for each shape
The volume is then converted into all three units. One cubic foot is 0.028317 cubic metres and one cubic yard is 27 cubic feet, so cubic yards are cubic feet divided by 27.
The waste allowance is applied as a multiplier of one plus the percentage divided by 100, and that is multiplied by the number of units to give the total. Bag counts divide the total volume by each bag's yield: about 0.011 cubic metres for 25 kg, 0.017 for 40 kg, 0.45 cubic feet for 60 lb and 0.60 cubic feet for 80 lb, rounded up. Weight is estimated at 2,400 kg per cubic metre.
Worked example: a 20 by 12 foot slab, six inches thick
The volume is 20 multiplied by 12 multiplied by 0.5, which is 120 cubic feet. Dividing by 27 gives 4.444 cubic yards, and multiplying 120 by 0.028317 gives 3.398 cubic metres.
Now add a 10 percent waste allowance for one unit. The multiplier is 1.10, so the total becomes 132 cubic feet, 4.889 cubic yards or 3.738 cubic metres. That is the figure to order against, since ready-mix is normally sold by the cubic yard or cubic metre.
The estimated weight is 3.738 multiplied by 2,400, or roughly 8,971 kg, close to 9 tonnes, which matters when planning access and formwork loading.
In bags, 132 cubic feet divided by 0.60 gives 220 eighty-pound bags, or 294 sixty-pound bags. At that quantity, ready-mix delivery is almost always cheaper and far quicker than mixing on site, which is exactly the kind of decision the bag count is there to inform.
Waste allowance, ordering and site realities
Running short is much worse than over-ordering. A second batch arriving after the first has begun to set creates a cold joint, a plane of weakness through the pour, so order to the upper end of your estimate.
Be careful with units. Thicknesses are commonly quoted in inches or millimetres while lengths are in feet or metres, and entering 6 instead of 0.5 for a six-inch slab inflates the answer twelvefold. Convert everything to the same unit before entering it.
The weight figure uses 2,400 kg per cubic metre, a standard density for normal-weight concrete; lightweight mixes differ. Bag yields vary by manufacturer, so check the yield printed on the bag. This tool estimates quantities only and is no substitute for a structural engineer's specification.